THERMAL-XR® PROJECT UPDATE: Cold Storage Facility in Singapore Savings, 8% Energy Reduction After coating with THERMAL-XR® on a Singapore, Residential air conditioner, a 8% Energy Reduction was measured by management regression analysis estimate. Energy Reduction 8% Measurement Days 76 days Unit Refrigerated System Date March 2021 Calculation Method GMG Management Estimate Calculation Pre vs Post […]
After coating with THERMAL-XR® on a public library air conditioner, a 52% ENERGY SAVINGS was measured and verified by an independent third-party certified verification and measurement professional (CVMP). It confirmed that the THERMAL- XR® treatment yielded an estimated savings of 52% or 348 kWh ± 91kWH with a relative uncertainty of 26% at a confidence […]
THERMAL-XR® PROJECT UPDATE: HEALTH & FITNESS CLUB #3, 22% ENERGY REDUCTION After coating with THERMAL-XR® on a Brisbane Health & Fitness Club 85 kW Air Conditioner, a 22% Energy Reduction was measured by management regression analysis estimate. Energy Reduction 22 % Energy Savings 1482 kWhr | Annualised Estimate 27046 kWhr Emission Savings 1187 CO2 kg […]
THERMAL-XR® PROJECT UPDATE: Poultry Processing Facility in Singapore Savings, 6.5% Energy Reduction After coating with THERMAL-XR® on a Poultry Processing Facility in Singapore, a 6.5% Energy Reduction was measured by management regression analysis estimate. Energy Reduction 6.5% Energy Savings 747 kWhr | Annualised Estimate 18177 kWhr Emission Savings 149.3 CO2 kg | Annualised Estimate 3625 […]
THERMAL-XR® PROJECT UPDATE: Residential Singapore Air Conditioner Savings, 13.4% Energy Reduction After coating with THERMAL-XR® on a Singapore, Residential air conditioner, a 13.4% Energy Reduction was measured by management regression analysis estimate. Energy Reduction 13.4% Energy Savings 5.6 kWhr | Annualised Estimate 127.7 kWhr Emission Savings 5.6 CO2 kg | Annualised Estimate 127.7 CO2 kg Measurement […]
THERMAL-XR® PROJECT UPDATE: FOOD INGREDIENT MANUFACTURER, 15% ENERGY REDUCTION After coating with THERMAL-XR® on a Food Ingredient Manufacturer in Singapore, 11.2 kW Air Conditioner, a 15% Energy Reduction was measured by management regression analysis estimate. Energy Reduction 15 % Energy Savings 3280 kWhr- annualised Emission Savings 3280 CO2 kg – annualised Measurement Days 45 (11 […]
THERMAL-XR® PROJECT UPDATE: LOGISTICS WAREHOUSE SINGAPORE, 15.7% ENERGY REDUCTION After coating with THERMAL-XR® on a Logistics Warehouse Singapore 11.2 kW Air Conditioner, a 15.7% Energy Reduction was measured by management regression analysis estimate. Energy Reduction 15.7 % Energy Savings 1482 kWhr | Annualised Estimate 49175 kWhr Emission Savings 149.3 CO2 kg | Annualised Estimate 4954 […]
THERMAL-XR® PROJECT UPDATE: HEALTH & FITNESS CLUB #2, 14% ENERGY REDUCTION After coating with THERMAL-XR® on a Brisbane Health & Fitness Club 14 kW Air Conditioner, a 14% Energy Reduction was measured by management regression analysis estimate. Energy Reduction 14 % Energy Savings 457 kWhr | Annualised Estimate 6177 kWhr Emission Savings 457 CO2 kg […]
THERMAL-XR® PROJECT UPDATE: HEALTH & FITNESS CLUB #1, 59% ENERGY REDUCTION After coating with THERMAL-XR® on a Brisbane Health & Fitness Club 14Kw Air Conditioner, a 59% Energy Reduction was measured by management regression analysis estimate. Energy Reductions 59 % Energy Savings 111 kWhr | Annualised 6752.5 kWhr Emission Savings 111 CO2 kg | Annualised […]
THERMAL-XR® PROJECT UPDATE: FAST FOOD RESTAURANT CHAIN UNIT #4, 5.4% ENERGY REDUCTION After coating with THERMAL-XR® on a Brisbane, Australia residential air conditioner, a 5.4% Energy Reduction was measured by management regression analysis estimate. Savings 5.4 % Energy Savings 61.5 kWhr | Annualised Estimate 1020 kWhr Emission Savings 61.5 CO2 kg | Annualised Estimate 1020 […]
- 1
- 2