BRISBANE, QUEENSLAND, AUSTRALIA – Graphene Manufacturing Group Ltd. (TSX-V:GMG) (“GMG” or the “Company”) is pleased to provide an update as to relevant changes following the recent Battery Joint Development Agreement (JDA) with Rio Tinto (17th May 2023) and the growing sales of Energy Saving products. These changes are designed to further align development activities and […]
BRISBANE, QUEENSLAND, AUSTRALIA – Graphene Manufacturing Group Ltd. (TSX-V:GMG) (“GMG” or the “Company”) is pleased to announce that GMG has signed distribution agreements with four separate distributors (“Distributors”) to buy GMG’s THERMAL-XR® and resell in their respective countries in the Heating Ventilation Air Conditioning and Refrigeration (HVAC-R) markets. The Distributors are focused on the following […]
HERMAL-XR® CASE STUDY | SINGAPORE AVIATION IT CENTRE, ~15.4.% IMPROVEMENT • Regression Analysis + Pre & Post Energy savings calculation/estimates. • Consistent climatic and operational conditions. More Information click Singapore Aviation IT Centre March 2023 For more THERMAL-XR®Projects | www.graphenemg.com/thermal-xr-projects/ Contact GMG for further information and/or partnership enquiries and installations [email protected] www.graphenemg.com | TSXV: GMG DISCLAIMER […]
BRISBANE, QUEENSLAND, AUSTRALIA – March 6th, 2023 – Graphene Manufacturing Group Ltd. (TSX-V:GMG) (“GMG ” or the “Company”) is pleased to provide an update on its ongoing investment in the Company’s Battery Development Centre (“BDC”). Critical members of GMG’s Battery Team have visited its United Kingdom partners to inspect and test the partially automated cell […]
THERMAL-XR® PROJECT UPDATE: Cold Storage Facility in Singapore Savings, 8% Energy Reduction After coating with THERMAL-XR® on a Singapore, Residential air conditioner, a 8% Energy Reduction was measured by management regression analysis estimate. Energy Reduction 8% Measurement Days 76 days Unit Refrigerated System Date March 2021 Calculation Method GMG Management Estimate Calculation Pre vs Post […]
The Australian Financial Review | The Battery That Charges 70 Times Faster Than Lithium-Ion. https:lnkd.in/gKst287M Author: Mark Ludlow linkedin.com/in/mark-ludlow-47964bb4 Brisbane Burea Chief/QLD Political Correspondent at The Australian Financial Review, Fairfax Media Please note that this paid licensed article requires a paid subscription to access. www.graphenemg.com | TSXV: GMG
THERMAL-XR® PROJECT UPDATE: HEALTH & FITNESS CLUB #3, 22% ENERGY REDUCTION After coating with THERMAL-XR® on a Brisbane Health & Fitness Club 85 kW Air Conditioner, a 22% Energy Reduction was measured by management regression analysis estimate. Energy Reduction 22 % Energy Savings 1482 kWhr | Annualised Estimate 27046 kWhr Emission Savings 1187 CO2 kg […]
CEO & Managing Director Craig Nicol discusses the potential disruptive capabilities of the Company’s battery technology with Soar Financial. www.graphenemg.com | TSXV: GMG
THERMAL-XR® PROJECT UPDATE: Poultry Processing Facility in Singapore Savings, 6.5% Energy Reduction After coating with THERMAL-XR® on a Poultry Processing Facility in Singapore, a 6.5% Energy Reduction was measured by management regression analysis estimate. Energy Reduction 6.5% Energy Savings 747 kWhr | Annualised Estimate 18177 kWhr Emission Savings 149.3 CO2 kg | Annualised Estimate 3625 […]
THERMAL-XR® PROJECT UPDATE: Residential Singapore Air Conditioner Savings, 13.4% Energy Reduction After coating with THERMAL-XR® on a Singapore, Residential air conditioner, a 13.4% Energy Reduction was measured by management regression analysis estimate. Energy Reduction 13.4% Energy Savings 5.6 kWhr | Annualised Estimate 127.7 kWhr Emission Savings 5.6 CO2 kg | Annualised Estimate 127.7 CO2 kg Measurement […]